TMGR: Switching Views Grouped by Project Expands Groups (161647)
The information in this article applies to:
This article was previously published under Q161647 SYMPTOMS
When you group a view by Project and then apply a different view, groups
and summary tasks are expanded, and tasks with assignments are collapsed.
WORKAROUNDMethod 1
After switching views, collapse or expand groups, summary tasks, and tasks
with assignments as desired.
Method 2
Instead of grouping by Project, group by a custom text field with a strict
list of Type Choices containing the project names.
The following steps detail how to create and group by a custom text field
named Team Project. You can use a different field name if you want, or if
another custom field already has the name Team Project. - Apply the view that you want to group. This must be a view that can be
grouped, such as a Tasks tab sheet or timescaled view or a Vital Signs
tab custom view.
- On the Format menu, click Add/Remove Columns, and then click the Custom
Fields button. Click the Add button.
- For Field Name, enter Team Project.
- In the Type list, select Text.
- Click "Define choices for this field" and enter the names of the
projects you want to use. Do not select the "Allow other values to be
typed" option. Specify a Default Choice if desired.
- Click OK, and then click Close.
- In the Add/Remove Columns dialog box, from the Available Fields list,
select Team Project, and then click the Add button. Use the Move Up and
Move Down buttons to position the field in the table. Click OK.
- For each task, from the Team Project field list, select the appropriate
project.
- If a Tasks tab view is to be grouped, then on the View menu, click
Grouping, and then click Custom Grouping.
If a Vital Signs custom view is to be grouped, then on the View menu,
click More Views, click the Add/Remove tab, and click the Edit button.
This displays the Vital Signs View wizard. Click Next, click Next
again, and then click the Group Tasks button. - In the Group By list, select Team Project, and then click OK.
If a Vital Signs custom view is being grouped, then you must also
click Finish, and then click OK. NOTE: To add or remove project choices, the Team Project field Type Choices
list must be updated.
STATUS
Microsoft has confirmed this to be a problem in the products listed at the
beginning of this article. We are researching this problem and will post
new information here in the Microsoft Knowledge Base as it becomes
available.
MORE INFORMATION
A header record is any record with a folder icon in front of its name in
the Task Name field. This includes group headings, summary tasks, and tasks
with assignments. To collapse or expand a header record, double-click the
folder icon in front of the name.
Task sheet views, task timescaled views, and custom Vital Signs views can
be grouped by People Assigned, Priority, Project, Status, and any custom
text field with a strict list of Type Choices. If a view is grouped by
Project, then switching views expands groups and summary tasks, and
collapses tasks with assignments. If a view is grouped by any field other
than Project, then the collapsed or expanded state of group headings,
summary tasks, and tasks with assignments is maintained when switching
views.
NOTE: The Custom Grouping dialog box contains a Show Summary Tasks option
that determines whether or not summary tasks are displayed. The Format
Sheet dialog box contains a Summary Tasks option that also controls this.
Modification Type: | Minor | Last Reviewed: | 8/17/2005 |
---|
Keywords: | KB161647 |
---|
|