TMGR: Summary Fields Show N/A or #Too Large# (159397)
The information in this article applies to:
This article was previously published under Q159397 SYMPTOMS
Summary level tasks show N/A in fields such as Total Work, or show #Too
Large# in fields such as Total Cost.
CAUSE
Microsoft Team Manager displays N/A or #Too Large# when a rolled-up field
has exceeded the numerical capacities for the field.
The capacity of a rolled-up work-type field is:
2,236,962.1 hours
The capacity of a rolled-up cost-type field is:
$922,337,203,685.477.58
STATUS
This behavior is by design in Microsoft Team Manager.